Per George & Sandy,
1) Went to Peterson AFB
2) Drove coach on lift
3) Raised lift
4) Drained engine oil / re-filled
5) Drained transmission oil / re-filled
6) Drained differential oil / re-filled with hand pump >:(
7) Drained generator oil / re-filled
8: Lubed chassis
9) Lowered lift
10) Went home
:D :D
Based on your previous accomplishments, looks like you had an easy day.
Hi guys,
All-in-all it took about 5 hours! Pretty long day. The hardest, and most time consuming, was getting the oil in the differential. I went through all four sides of Physical Graffiti before I finished. No kidding. Next time...either an electric pump, or one that works with a hand drill.