Larry has been hard at work on the new cabinets around our refrigerator. He started in right away on Tuesday morning and should finish up by noon tomorrow. Jo Ann has some pictures of the area before the renovation and a couple of the work in progress. Tomorrow she'll take some of the finished project and post the whole set.
Larry finished up about 4:00 this afternoon. Jo Ann did get some pictures, but she's busy clearing out the bedroom of all of the kitchen stuff that we stashed there Monday so Larry could work.
I will be attaching one or two pics to each post to show the work done on our coach to renovate the refrigerator space.
This is what the temporary shelves looked like. We've lived with them for the past two years, since we replaced the RV frig with a residential frig.
This is the framework for the new shelves. We had placed the frig on the floor. As you can see, it now is above a cabinet.
Only one pic in this reply. It shows what the interior of the shelves look like. He lined them with the same stuff we have on the ceiling.
The final two pics show the cabinet doors on the left of the frig and below.