Skip to main content
Topic: Completed today (Read 726 times) previous topic - next topic

Completed today

Per George & Sandy,

1) Went to Peterson AFB
2) Drove coach on lift
3) Raised lift
4) Drained engine oil / re-filled
5) Drained transmission oil / re-filled
6) Drained differential oil / re-filled with hand pump  >:(
7) Drained generator oil / re-filled
8: Lubed chassis
9) Lowered lift
10) Went home

 :D  :D
Brian and Jen

Re: Completed today

Reply #1
Based on your previous accomplishments, looks like you had an easy day.
George Stoltz.  Retired from full-time living in a great Foretravel and now are back to living in a traditional sticks and bricks in Florida.

 

Re: Completed today

Reply #2
Hi guys,

All-in-all it took about 5 hours!  Pretty long day.  The hardest, and most time consuming, was getting the oil in the differential.  I went through all four sides of Physical Graffiti before I finished.  No kidding.  Next time...either an electric pump, or one that works with a hand drill.
Brian and Jen