Skip to main content
Topic: bath floor tile project (Read 1187 times) previous topic - next topic

bath floor tile project

I wanted to get rid of the wall to wall carpet in the bathroom. Dave says ok he will do it for me. I get to pick out the tile. Yay!
18 yr old carpet is in amazingly good shape-- but styles have changed.
The selected media item is not currently available.The selected media item is not currently available.The selected media item is not currently available.
The selected media item is not currently available.
The selected media item is not currently available.The selected media item is not currently available.

Needs new subfloor to level up to cleats at base of steps

The selected media item is not currently available.
The selected media item is not currently available.Dave notes: in picture above, the box over the wheel well will have to be modified for access, by removing the cleats from the box, and installing them on the floor, and then sliding the box behind the cleats. Tile will cover the cleats forever, box will be removable for service.

I've chosen an 18" sq travertine marble tile, honed and filled.
The selected media item is not currently available.
The only piece out of 16 that doesn't have to be cut

The selected media item is not currently available.The selected media item is not currently available.The selected media item is not currently available.





The selected media item is not currently available.

The selected media item is not currently available.Step riser pieces show the miter angle cuts, done on the wet saw with a cutting block gauge to get the 23 1/2 degree angles on 4 cuts. Lid will cover the seams.

The selected media item is not currently available.
all those complex cuts in a tiny area



All tile in place, adhesive needs to set now

great fit and finish, now all I have to do is grout it. That's the least I can do after all Dave's hard work. Congratulations Dave. Nice job.

you can see more pictures of the project here
Bath floor tile project - sailwing's Photos




Re: bath floor tile project

Reply #1
Looks great

Re: bath floor tile project

Reply #2
Thanks Ernie.  It looks better in person, and with the final grout, edge flexible caulk and sealed.  After just 3 days of labor, for 12 sq. feet of tile, I have learned I am glad I have another career to pay for my toys.
Dave Cobb
Buckhorn Lake Resort The Club, #6202, Kerrville TX
check the map.  I do rent it out when I am traveling!
2001, U320, 36' #5887, in Kerrville, FT Club #17006, (7/23 to present)
2024 Jeep Grand Cherokee L, Summit, white
EX: 98 U295, 36' #5219, (mid door), (4/13-10/23)
EX: 93 U225, 36' (4/11 to 4/13)

Re: bath floor tile project

Reply #3
Good job David. When can you start on my U300? My shoulder still hurts.
The selected media item is not currently available.Kent Speers
Locust Grove, OK
1993 U300 SSE 40' (Restored at FOT 2009) Build 4323
720 watts Solar
6V92TA DDEC Silver Engine
2014 Subaru Outback

Re: bath floor tile project

Reply #4
Bring it down, and we can start as soon as my knees recover.  Or after all the new walnut paneling and trim is on areas that are carpet now and will not be when we do the floors.

Biggest pain for me was the tiny working area, and laying on the angle or point.  Doing your walk thru bath would not be as big a deal.  We had to cut 15 out of 16 pieces, and I had to redo one of those when it broke.  A ceramic tile would not have broken as easily.
Dave Cobb
Buckhorn Lake Resort The Club, #6202, Kerrville TX
check the map.  I do rent it out when I am traveling!
2001, U320, 36' #5887, in Kerrville, FT Club #17006, (7/23 to present)
2024 Jeep Grand Cherokee L, Summit, white
EX: 98 U295, 36' #5219, (mid door), (4/13-10/23)
EX: 93 U225, 36' (4/11 to 4/13)

Re: bath floor tile project

Reply #5
Nice work Dave, you can come and work with me, pay is the pits as usual.
John h
Coachless, now use aircraft. 2003 Ford Travelair TC280 class C. Super shape. Just for 1 yr .
1994 Ford E350 ClassC,total renovation inside and out. Now sold.
2000 U295  36' Cummins 350 c/w Banks Stinger, Resonator upgrade,Solar, LED lites.Residential fridge with slide out pantry. Build 5674. Sold
ex 92 GV 022C ored Cummins. Sold
ex 95 GV240 cat 3116. Sold
2017 Mini cooper s & 2016 land Rover LR2 HSE  LUX.
jhaygarth@aol.com    SKP #130098
treat everyone as you would like to be.

Re: bath floor tile project

Reply #6
               Job well done David. That was the first project I did after we bought our FT was to get rid of that stinky carpet around the "hopper". Dave Flanagan gave me some pointers and found me some tile that matched the existing stuff.

            I will never understand the concept of carpet in any bath.
Dean & Deirdre

2012 Arctic Fox 22GQ
Was 2003 U270

Re: bath floor tile project

Reply #7
For those who want to prevent "stinky" carpet: Go to a Dollar Store and buy a plastic bat, cut off both ends and one has a nice, long funnel for those who refuse to sit when performing a function.
Nitehawk,  Demolition Lady, & our NEW master, Zippy the speeding BB cat.
1989 Grand Villa 36' ORED
Oshkosh chassis, 8.2 DD V8
2006 Saturn Vue AWD


Re: bath floor tile project

Reply #9
I grew up with campers and boats, and my dear old Dad had signs made for the walls behind the toilets.  It read something like, "gentlemen will please be seated".  If he caught anyone not obeying his rule, they could go on deck or out in the woods.  Has worked in our home, boats and RV's, thanks Dad.
Dave Cobb
Buckhorn Lake Resort The Club, #6202, Kerrville TX
check the map.  I do rent it out when I am traveling!
2001, U320, 36' #5887, in Kerrville, FT Club #17006, (7/23 to present)
2024 Jeep Grand Cherokee L, Summit, white
EX: 98 U295, 36' #5219, (mid door), (4/13-10/23)
EX: 93 U225, 36' (4/11 to 4/13)

Re: bath floor tile project

Reply #10
Sign in office where I once worked and I was one of the few men.  " If you sprinkle when you tinkle please raise the seat " :)
Gary B

Re: bath floor tile project

Reply #11
Glen and I went to one of my wholesalers to purchase some trim for his stairs. They had a couple pieces of ceramic tile with flexible grout on the counter. I couldn't take the pieces apart and the joint was very flexible. Maybe a solution to cracked grout. The name of the company is Professional  Flooring Supply. They have a website but the graphics were drawn by some 12 year old- hard for over 60 eyes to figure out

Re: bath floor tile project

Reply #12
Great job! Just showed the DW the pictures as she has already bought the materials for our U225 which is identical to yours in the bathroom area. Glad you did it first. :)

Sue is using small tiles on a mesh... but has a sunburst design in the middle. I'm not exactly sure how it's going to look but when she gets off work for the summer (in 2 weeks) she's going to get started on it.

Thanks for the photos!!!
Craig
1993 U225 36' Unihome GV with PACBRAKE exhaust retarder, Banks Stinger and Solar Panels.
Toad: 1999 Jeep Wrangler 2-door soft-top.

"No one has ever had to evacuate a city because the solar panels broke."

Re: bath floor tile project

Reply #13
Dave, I have same bath and already have tile except for the step and toilet platform which are carpeted.  That miserable little step is my nemesis. I would be very fearful with this thing tiled.  Did you consider enlarging the step and incorporating the vent into the larger step?  This is what I've been contemplating.  Having the carpet away from the toilet surround would be especially nice.  Looks great by the way.
Dwayne Keith
1992 U240
3116/MD3060

Re: bath floor tile project

Reply #14
I too looked at making it larger, and also like maybe raise the whole bath with a step up at the door threshold.  Then just figured someone had already done that at FOT, and then gone back with what we see today.

I could have done the furnace vent, shooting the air up as a floor vent.  I looked at moving the furnace vent to behind the rear of the toilet into the linen cabinet below the door.  I did not like the idea of stepping out and down from the bathroom into the hall.  And all that would have made service more difficult some day.  The removable tile on the step box top, with the screws that hold the box won out in the end.  The box can be unscrewed and lifts up and out of the bathroom just in case we ever need access to the shower plumbing or the wires that run under the dumb box.  The vent below the shower pan still works to allow air into or out of the basement bays.
Dave Cobb
Buckhorn Lake Resort The Club, #6202, Kerrville TX
check the map.  I do rent it out when I am traveling!
2001, U320, 36' #5887, in Kerrville, FT Club #17006, (7/23 to present)
2024 Jeep Grand Cherokee L, Summit, white
EX: 98 U295, 36' #5219, (mid door), (4/13-10/23)
EX: 93 U225, 36' (4/11 to 4/13)

Re: bath floor tile project

Reply #15
Great job, Dave.  Looks professional grade.  If the double sided tape fails in the future...use velcro...it's your friend for removable panels as you do not ever have to replace it as it's likely the tape is a single use adhesive.  But, chances are you'll never have to get inside that ever again...hopefully.
Peter
Peter & Beth Martin
No Forrest? What have you done?
MC# 15890 until Dec 2016; FMCA #F329677
Cincinnati, OH

 

Re: bath floor tile project

Reply #16
Hope we never need under the top tile.  I had the velcro ready and in hand and thought the tape was going to work well with gravity on this job.  I did use double sticky foam tape and it has some give to touch more surface than thin carpet tape.  Not like we need yearly access.  I also posted into the coach file the a set of photos showing how to get back into the area.  Might even add a small note to the wall saying "step is removable, see book".
Dave Cobb
Buckhorn Lake Resort The Club, #6202, Kerrville TX
check the map.  I do rent it out when I am traveling!
2001, U320, 36' #5887, in Kerrville, FT Club #17006, (7/23 to present)
2024 Jeep Grand Cherokee L, Summit, white
EX: 98 U295, 36' #5219, (mid door), (4/13-10/23)
EX: 93 U225, 36' (4/11 to 4/13)