Hi, I have purchased a tension rafter for the mid awning area and the optional ground support.<br/><br/>Question; there is a plate approx 2 1/2 x 5 1/2 inches which takes 4 rivets, one in each corner. The bracket that holds the rafter takes 2 large screws through the plate and into the coach. The area in question is adjacent to and 5 inches below the second awning slot...