My desire was to re-work this area to allow me easy access to whats going on behind the panels. Now, I can remove the panels without having to struggle getting the water lines loose and the BW and GW drain valve cables loose. <br/>I also installed the new SeeLevel tank monitoring system. I put it's read out in the bay.<br/>I removed the old faucet as it looked really bad and...