Renovation Continues & Completed
Well we started with removing all the carpet and installed our plank flooring from front to back and tiled the toilet area. Then we replaced all of the carpet at the entrance, cockpit area and around the bed. Today we completed the backsplash in the bathroom with matching tile from the toilet area after removing the mirror. Then we removed the Corrian around the kitchen backsplash and replaced it with tile. I used a epoxy mortar and grout in one product. I was able to lay and grout at the same time. It is used in kitchen counters, heavy wet areas indoors and outdoors.
John M