Re: Grand Villa Bulkhead/Lower Floor Repair
Reply #18 –
Thanks Don
I actually mentioned to Chad at trueline today, about the diagonal tubing you put in the bat floors.I remembered seeing it in your pictures last year.Chad said he was already doing that.Randall's coach is going to be better then new. He has it at the right place. These guys are awesome. Know them for years.
They probably did a million+dollars worth of work for me over the 2 1/2 yrs I was recon (reconditioning manager) for La Mesa RV.Never had a complaint.
BTW. It is interesting that FT went to the vertical angle iron on the later coach. The box tubing worked much better.Chad had measured Randall's coach every which way possible. It never moved, even though the floor in the bays were gone.
Cheers