I checked the forum, and the last thread was back in 2012, so maybe there is different thinking now.<br/><br/>We're going to be moving to a concrete site that is nearly perfectly level (or so we are told). We'll be there until the end of September. Would it make sense to dump all of the air, then RAISE the low side (if there is one) a bit to get level? If the site is actually as...