Re: Covid-19 Busy Work
Reply #10 –
Well I finished all of current Covid-19 busy work. We finished the roof project removing satellite system, extra plate, repaired all of the holes and refinished the entire roof. Replaced the two 21 year old ac's, the 2 return vents and thermostat,
sewer, refrigerator and fantastic fan vent covers. AC's were an easy install and able to control everything with the new thermostat. We removed the ULine Icemaker, the old Bose System and all of the old electronics. Just kept the Bose speakers. Replaced the TV and made a storage area under the tv. Replaced the surround sound, dvd player and moved all of the electronics in the cabinet over the driver's seat and closed off the old area in the front of the coach. Installed a new subwoofer in the area of the ULine Icemaker tucked away behind the drawers. Installed drawers and a door in the area old area. We also replaced a lot of the old lighting with LED in the overhead florescent fixtures and the rope lighting behind the window valances.
The jobs were very challenging but doable. Just need to remember the old rule of any craftsman. Measure twice and cut once. At times I would measure once then cuss twice whenever I got in a hurry or over confident.
I have a new list of projects on the outside of the coach repairing some chips from rocks or other objects, removing weathered decals and buffing the entire coach. Not too big of a job, just time consuming. Just need to take a week off first.
Attached are some pictures. Hope this encourages others to not be afraid to take on some challenges. With the internet, youtube and this forum you can find the answers to many of your projects.
John M.